Building Specifications
- 100,000 sq. ft. facility
- 45,000 sq. ft. of white space
- Immediate capacity available
- Leasable office space available
- Floor load 1500kg/m2
Power
- 10MW utility power (2N)
- 4.8MW total critical power capacity dependent on configuration
- Configuration options: N, 2N N+1
- Static UPS units and generators provide minimum 24 hour backup coverage
- 24 hours of on-site fuel storage
- Two feeders with diverse routes from adjacent substation
Sustainability
- Renewable power available
- Dedicated Electric Vehicle (EV) charging spots available on-site
- Water-side economizers provide free cooling during low temperature ambient conditions
- A district heating solution is available. QTS Groningen feeds the city of Groningen’s heating system, and in return receives cooling.
Building Specifications
- 100,000 sq. ft. facility
- 45,000 sq. ft. of white space
- Immediate capacity available
- Leasable office space available
- Floor load 1500kg/m2
Power
- 10MW utility power (2N)
- 4.8MW total critical power capacity dependent on configuration
- Configuration options: N, 2N N+1
- Static UPS units and generators provide minimum 24 hour backup coverage
- 24 hours of on-site fuel storage
- Two feeders with diverse routes from adjacent substation
Sustainability
- Renewable power available
- Dedicated Electric Vehicle (EV) charging spots available on-site
- Water-side economizers provide free cooling during low temperature ambient conditions
- A district heating solution is available. QTS Groningen feeds the city of Groningen’s heating system, and in return receives cooling.
-
Building Specifications
-
Power
-
Sustainability
Groningen Netherlands Data Center
Only 20 minute drive from regional airport.