Groningen Netherlands Data Center

Zernikelaan 16
9747 AA Groningen, Netherlands

One of the largest mega data centers in the Northern Netherlands, in the heart of the FLAP data center market

Apply for Open Positions at our Groningen Location

Contact Us
Building Specifications


  • 100,000 sq. ft. facility
  • 45,000 sq. ft. of white space
  • Immediate capacity available
  • Leasable office space available
  • Floor load 1500kg/m2
Power


  • 10MW utility power (2N)
  • 4.8MW total critical power capacity dependent on configuration
  • Configuration options: N, 2N N+1
  • Static UPS units and generators provide minimum 24 hour backup coverage
  • 24 hours of on-site fuel storage
  • Two feeders with diverse routes from adjacent substation
Sustainability


  • Renewable power available
  • Dedicated Electric Vehicle (EV) charging spots available on-site
  • Water-side economizers provide free cooling during low temperature ambient conditions
  • A district heating solution is available. QTS Groningen feeds the city of Groningen’s heating system, and in return receives cooling.

Building Specifications


  • 100,000 sq. ft. facility
  • 45,000 sq. ft. of white space
  • Immediate capacity available
  • Leasable office space available
  • Floor load 1500kg/m2

Power


  • 10MW utility power (2N)
  • 4.8MW total critical power capacity dependent on configuration
  • Configuration options: N, 2N N+1
  • Static UPS units and generators provide minimum 24 hour backup coverage
  • 24 hours of on-site fuel storage
  • Two feeders with diverse routes from adjacent substation

Sustainability


  • Renewable power available
  • Dedicated Electric Vehicle (EV) charging spots available on-site
  • Water-side economizers provide free cooling during low temperature ambient conditions
  • A district heating solution is available. QTS Groningen feeds the city of Groningen’s heating system, and in return receives cooling.
  • Building Specifications
  • Power
  • Sustainability

See for Yourself, Schedule a Tour

Book Now

Groningen Netherlands Data Center

Only 20 minute drive from regional airport.